National leader's benchmarks |
 |
1996 Stepnogorsk town, Zaporozhye Region, Ukraine Executing the Commission of the President of Ukraine to construct a boiler-house in Stepnogorsk town of Zaporozhye Region, Ukraine
Within 2 months, a 20 MW boiler-house was constructed in Stepnogorsk town of Zaporozhye Region, Ukraine. Rassvet OJSC President Petro Sabashuk was decorated with Distinguished Service Order of the III degree. Three Rassvet OJSC officers were given the Merited Officer of Municipal Utilities of Ukraine title.
|
1998 Zaporozhye, Ukraine Star Way 98 Contest
The Winner Diploma was conferred in the Scientific Work of the Year nomination for development of the Yuzhnaya High Power Efficiency Demonstrational Zone Project
|
1998 Kiev, Ukraine Development of the National Program for Co-generation Technology Based Development of the Private Power Sector of Ukraine
The basic model was developed of an alternative development line for the power industry of Ukraine based on the wide-scale application of co-generation technologies
|
1999 Kiev, Ukraine Participation in creation of UkrEsco Energy Conservation Service Company of Ukraine
UkrEsco Energy Conservation Service Company of Ukraine was created jointly with the State Property Fund of Ukraine and State Committee for Energy Conservation.
|
2000 Zaporozhye, Ukraine Development of exhaust-fired-boiler plant project with optional garbage utilization in Zaporozhye, Ukraine
The first, landmarking for Ukraine, project was developed of an environmentally safe exhaust-fired-boiler plant with optional solid domestic wastes utilization. Design contractor: Rassvet-Energy Scientific Research Center OJSC. The implementation of the project was suspended due to political reasons.
|
2000 Kiev, Ukraine Participation in creation of the Co-generation Forum of Ukraine
The Co-generation Forum of Ukraine was created jointly with the Power Engineers Union of Ukraine, Technical Thermal Physics Institute of the National Academy of Sciences of Ukraine, the Ministry of Fuel and Energy of Ukraine.
|
2000 Kiev, Ukraine Participation in creation of the Energy Conservation League of Ukraine
The Energy Conservation League of Ukraine was created jointly with the State Committee of Ukraine for Energy Conservation.
|
2001 Kiev, Ukraine Fuel and Power Industry Leader All-Ukrainian Contest
The Finalist Diploma was conferred in the Investor nomination for investing the Yuzhnaya Co-generation Power Plant in Zaporozhye, Ukraine.
|
2003-2005 Kiev, Ukraine Drafting the Law of Ukraine “On Combined Production of Thermal and Electric Power (Cogeneration) and Waste Power Potential Usage”
Institute of Applied Researches in Power Industry, headed by Associate of the National Academy of Sciences of Ukraine, Dr. Eng. Victor Klimenko, was the coordinator of the Law drafting. The Law of Ukraine “On Combined Production of Thermal and Electric Power (Cogeneration) and Waste Power Potential Usage” (¹ 2509-IV) was passed by the Verkhovna Rada (Parliament) on April 05, 2005, and thereafter signed by the President of Ukraine.
|
2003-2005 Kiev, Zaporozhye, Ukraine Drafting the Law of Ukraine “On Heat Supplies”
Institute of Applied Researches in Power Industry, headed by Associate of the National Academy of Sciences of Ukraine, Dr. Eng. Victor Klimenko, was the coordinator of the Law drafting. The Law of Ukraine “On Combined Production of Thermal and Electric Power (Cogeneration) and Waste Power Potential Usage” (¹ 2509-IV) was passed by the Verkhovna Rada (Parliament) on April 05, 2005, and thereafter signed by the President of Ukraine.
|
2003-2005 Zaporozhye, Kiev, Ukraine Drafting the National Program for Reform, Modernization and Development of Municipal Power-generating Utilities of Ukraine
The draft National Program was submitted to the Verkhovna Rada (Parliament) of Ukraine and the Cabinet of Ministers of Ukraine.
|
Since 2005 Kiev, Zaporozhye, Ukraine Development and implementation of Investment Project of Construction of Dispersed Cogeneration Network to the Total Installed Capacity of 5,000 MW in Ukraine
The project is scheduled for 10 years and provides for realization of about 1/3 of the Ukraine’s cogeneration potential in public and industrial heat-and-power industry – 3,000 and 2,000 MW accordingly. In 2005, Finalist Diplomas were conferred to the Project in two nominations of Fuel and Power Industry Leader All-Ukrainian Contest.
|
 |
|
|