Technologies that became reality |
 |
OJSC «Smilyansktsukrokombinat», Smila town, Cherkaskaya region. Cogeneration station project 3,3 MW on the base of engine “Jenbacher"
|
OJSC «Sumykhimprom», Sumy City. Energy audit and preproject development of energy-supply system reconstruction with introduction of cogeneration and other energy-supply technologies.
|
OJSC „Rassvet”, Zaporizhzhya City Project and construction of cogeneration station “Pivdenna” with productive capacity 2,5 ÌW, reconstruction of boiler house.
|
„ZÌÅÊ, ltd.”, Zaporizhzhya City Project and construction of system of flue gases heat recovery at “Pivdenna” boiler-house.
|
ÄState Stock Company (SSC) „Titan”, Armyansk town, ÀR Crimea. Analyses of energy loads of enterprise and development of feasibility study of investments of reconstruction of heat and power plant with introduction of cogeneration technology.
|
OJSC „Mykolaevskyi glynozemny zavod – Nikolaev aluminous plant”, Nikolaev City Analysis of energy loads of an enterprise and preproject development of cogeneration plant reconstruction by means of erection of boilers by electrogenerating equipment for increase of electric power.
|
Subsidiary production unit „Odessky priportoviy zavod”, Odessa City. Preproject development of boiler reconstruction by means of energy erection of boilers BKZ-75-39 GÌÀ by gas turbine engine-generators, and analysis of usage efficiency in the scheme of gas- piston electric stations and steam turbines.
|
Regional boiler house „Pivnichna 1”, Odessa City Feasibility study of investments: construction of cogeneration station at boiler house „Pivnichna 1” with productive capacity 2,0 ÌW on the base of gas engine-generators 11GÄ 100Ì1.
|
Kiev region Feasibility study of cogeneration station construction in the system NSC “Naftogas of Ukraine”, compressor station „Boyarka”, compressor station „Dolina”, Kievtransgas, central office.
|
Novaya Kakhovka City Development of optimal technical and economic solution of heat supply systems reconstruction in Novaya Kakhovka City, Kherson region.
|
AR Crimea The program of marginal wells completion of natural gas fields of the Crimean peninsula.
|
Factory of bank paper of NBU, Malin town, Zhitomir region ÒFeasibility study and production project of energy module for supply of the enterprise by electric and heat energy.
|
Shostka town, Sumskaya region Preproject development of cogeneration plant construction on base of OJSC “Shostkinskiy miskmolkombinat”.
|
Odessa City Preproject development construction versions of cogeneration plant at SBO “Pivdenna” and SBO “Pivnichna”, Odessa City.
|
CJSC “Finansova investiciyna companiy”, Zhitomir region Technical and economic analysis and ground of cogeneration stations in Zhitomir region.
|
Komsomolsk town, Poltava region Preproject development of boilers reconstruction versions of Central boiler house and boiler house #15 into cogeneration plants.
|
Branch CJSC „Priazovkurort” KKH „Kurort” Berdyansk City, Zaporizhzhya region Preproject development of boiler reconstruction with cogeneration technology usage.
|
OJSC „Rubezhansky kartonno-tarny kombinat”, Rubizhne town, Lugansk region Preproject development of cogeneration plant with erection of gas-turbine generator.
|
Kiev City Arrangement of energy audit of the objects of OJSC ÀÊ „Êievvodokanal”.
|
OJSC "Poltavski vagonoremontny zavod” Poltava City Feasibility study of cogeneration plant recommendations with usage of cogeneration technology.
|
OJSC "Poltavski masloextraciony kombinat" Poltava City Preproject development of cogeneration technologies introduction.
|
OJSC "Pobuzky feronikel kombinat" Pobuzke town, Kirovogradsk region Preproject development of energy potential recovery of pressed natural gas and construction of energy complex at gas-distributing station.
|
 |
|
|